Ultra-low altitude place-driven pile construction method

A drilling technology for cast-in-place piles that enables construction in narrow spaces!!

The drilling machine (Compact Reverse JET18・C-JET18) used for the super low headroom cast-in-place pile method (Supercompact Reverse Circulation Drilling Machine) is the smallest among this type of drilling machines. In foundation pile construction on train station platforms, the work space is limited to nighttime, leading to time constraints that prolong the construction period and increase costs. Additionally, when construction machinery is left on the platform, temporary enclosures for the machinery are required outside of working hours, which obstructs passenger traffic. To address these issues, we developed a super compact reverse circulation drilling machine that can perform foundation pile construction in low headroom and narrow spaces, such as beneath platforms, by miniaturizing the pile construction machinery. This drilling machine can accommodate extremely narrow spaces and can drill large diameters (3.0m). *For more details, please download the PDF or contact us.*

  • Pile and foundation work
  • Ground foundation construction method
  • Foundation construction machinery
  • Driving pile method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ultra-low altitude place-driven pile construction method

Site-cast pile drilling technology that enables construction in narrow spaces.

Our company handles a construction method using a super low-headroom bored pile drilling machine for installing cast-in-place piles in very narrow construction areas. We have adopted a turntable drive system for the drilling rod, achieving a total machine height of 1.8m in combination with a dedicated special Kelly rod (L=1m). Excavation work can be performed with a headroom of 2m. Additionally, we have equipped the machine with a drilling management system that visualizes and records construction information, allowing for feedback in construction management. 【Features】 ■ Lightweight and compact ■ High construction capability ■ Systematized drilling management *For more details, please download the PDF or contact us.

  • Special Construction Method
  • Driving pile method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TBH construction method

Large-diameter drilling is possible! It demonstrates its capabilities under narrow conditions with low working headroom, such as beneath existing structures!

The "TBH Method" is a construction method applied in cast-in-place pile work, utilizing a specialized drilling machine equipped with a reverse circulation mechanism and a top drive system. Compared to the BH method, which employs a positive circulation mechanism and spindle system, this method facilitates large-diameter drilling as a permanent pile. In addition to the conventional reverse method, this technique can also be executed under narrow and low-space construction conditions. Due to the reverse circulation drilling method, issues related to the settling and sedimentation of slime generated during drilling have been resolved, allowing for reliable management and construction. 【Features】 - The construction machinery is compact, enabling work in confined spaces. - It can be executed even in low working heights, such as under elevated structures or indoors. - It is lightweight and small, making transportation easy even on narrow access roads. - Heavy machinery is not required for the assembly and disassembly of the machine. - Noise and vibration levels during construction are extremely low. *For more details, please refer to the PDF materials or feel free to contact us.

  • image_02.png
  • image_03.png
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation construction
  • Driving pile method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration